• Proyectos energéticos​

We develop the EPC of a 275 kW photovoltaic installation in Getafe

Sacyr Energía has carried out a turnkey EPC project for a photovoltaic installation for the company Contenur in Getafe (Madrid).

The project involved the installation of 275.5 kW of capacity through 501 photovoltaic panels, each with a power rating of 550 W. The direct current generated is converted into alternating current using two inverters with a capacity of 125 kW each, resulting in a total nominal power of 250 kW.

This photovoltaic installation for Contenur will avoid the emission of 10.6 tonnes of CO₂ per year.

Sacyr develops, builds, and operates clean energy generation plants worldwide. The company works with its clients under the contracting model that best suits their needs, including PPA, EPC, or fixed-fee schemes over a number of years, as well as self-consumption solutions with no grid export and collective self-consumption.

 
 

  • Institucional

We are participating in the Pollutec 2026 trade show in Algiers

We participated in the 21st edition of the International Exhibition of Water Equipment, Technologies and Services, SIEE Pollutec 2026, held in Algiers (Algeria).

We have participated with Sacyr Agua in this fair with a stand, together with our Algerian subsidiary Sacyr Lilmiyah.

In a meeting with the Algerian Minister of Water Resources, Lounès Bouzegza; together with our client the Algerian Desalination Company (ADC), Eduardo Campos, CEO of Sacyr Agua; Aurora Díaz de Espada, Director of International Operations of Sacyr Agua, and other personalities and managers; highlighted the prospects for development in the desalination of seawater.

At this fair we took the opportunity to highlight ourcutting-edge solutions in the sector, emphasizing that water is one of the great strategic challenges. As well as our commitment to innovation, efficiency and long-term commitment to developing sustainable infrastructures and strengthening alliances that contribute to guaranteeing access to water in areas with shortages, as is the case in Algeria.

  • Algeria

Eduardo Campos Pozuelo

CEO of Sacyr Agua

Jesús Cabrero Martín

National business development, Bidding and Contracts directorare

Pepe Sanz Rodríguez

People management directorare​

0 Folders
2 Documents

This website uses its own and third-party cookies to improve the user experience and analyze their behavior in order to improve the service offered.
You can consult additional information about the cookies installed on our Cookies policy.

Cookie Settings

Cookie declaration

TECHNIQUES

These cookies are exempt from compliance with article 22.2 of the LSSI in accordance with the recommendations indicated by the European authority on privacy and cookies. In accordance with the above and although configuration, acceptance or denial is not possible, the editor of this website offers information about them in an exercise of transparency with the user.

  • Name: LFR_Session_STATE_*, Provider: Liferay, Purpose: Manages the session as a registered user , Expiration: Session, Type: HTTP

  • Name: GUEST_LANGUAGE_ID, Provider: Liferay, Purpose: Determines the language with which you access , to show the same in the next session, Expiration: 1 year, Type: HTTP

  • Name: ANONYMOUS_USER_ID, Provider: Liferay, Purpose: Manages the session as an unregistered user , Expiration: 1 year, Type: HTTP

  • Name: COOKIE_SUPPORT, Provider: Liferay, Purpose: Identifies that the use of cookies for the operation of the portal, Expiration: 1 year, Type: HTTP

  • Name: JSessionID, Provider: Liferay, Purpose: Manages login and indicates who is using the site, Expiry: Session, Type: HTTP

  • Name: SACYRGDPR, Supplier: Sacyr, Purpose: Used to manage the cookie policy , Expiration: Session, Type: HTTP